Montreal Metropolitan Area - Quebec

 

109,000 sq.ft. data center designed with Uptime Institute standard between class 2 and 3 with a 35,000 sq.ft. cleanroom and 10 MW of power. The building and equipment have been developed with modularity to respond to the client’s need on a 20 years period. A complex generator system has been installed to allow a 48 h autonomy period without charging.  

Building Data
80000000
Construction Costs
109000
Building Area (Square Feet)
2016
Date of Completion